On-demand Webinars
Webinar

The hidden cost of getting solar plus BESS wrong

This webinar explains how combining solar PV with battery storage (BESS) changes performance management, highlighting why traditional solar approaches fail and what operators must do differently to avoid costly mistakes and optimize hybrid systems.

twaicetech

TWAICE webinar: The hidden cost of getting solar plus BESS wrong Apr 22, 2026 attend event here:

www.twaice.com/webinar/the-hidden-cost-of-getting-solar-plus-bess-wrong

#thinktwaice

As hybrid PV + BESS projects become standard practice, the old performance frameworks inherited from standalone solar PV are beginning to break down.

As the solar industry increasingly integrates battery storage, operators are realizing that batteries behave very differently from panels under sunshine.

A clipped PV string loses yield passively and silently. A poorly managed BESS rack, however, can take an entire system offline. Similar large-scale battery assets may operate under vastly different dispatch modes and degradation curves, allowing losses to accumulate unnoticed without the right expertise and monitoring in place. What may be considered a rational O&M decision in solar can become a significant operational and financial risk in BESS. By the time an optimizer identifies the issue, it may already be too late for fast and cost-effective corrective action.

Managing hybrid performance successfully requires understanding exactly where solar logic ends and storage logic begins — from DC overbuild ratios and BESS capacity reservation strategies to warranty allocation when both assets share a DC bus.

In partnership with pv magazine, TWAICE brings together industry experts to explore the technical and commercial realities of operating PV and BESS assets side by side, highlighting the common mistakes operators make and how to avoid them.

Chris Pickett, Senior Solutions Engineer at TWAICE, and Jonas Soellner, Technical Solution Engineer at TWAICE, discuss topics including DC overbuild strategy, BESS capacity and cycle management, monitoring gaps between asset classes, and more.

Webinar topics include:

  • Why performance logic for standalone solar PV differs fundamentally from solar + BESS systems — and what that means for revenue modeling
  • Why ignoring certain data may work in PV operations, but can become a major issue in BESS
  • Commercial and warranty complexity in DC-coupled hybrid systems
  • The realities of clipping, cycling, failure modes, and operational cost drivers
  • The most common mistakes operators make when managing hybrid assets
  • Audience Q&A

The session is moderated by Tristan Rayner, Editor at PV magazine ESS News.

Watch the recording
Webinar

Product Webinar: What's New with TWAICE BESS Analytics (Summer '26 edition)

Join the product webinar and explore the newest features designed to help BESS owners and operators improve revenue, performance, safety and warranty management. Engage in a live Q&A with TWAICE product managers, and get insights into what’s coming up next.

Sign up now

Related Resources